Services / SAP Solutions / Move from ECC & On-Premise
Move from ECC & S/4HANA On-Premise

Choose your route to the cloud before the deadline chooses it for you.

Whether you're on SAP ECC or an older on-premise SAP S/4HANA release, there are four ways into SAP's cloud ERP. Each keeps something different and costs something different. We help you pick the right one, prepare your system for it, and run the move with rehearsed, measured downtime.

Where you're going. SAP Cloud ERP Private (through RISE with SAP) or SAP Cloud ERP (through GROW with SAP). This page covers the move itself.

Illustration of a conversion tracked across rehearsals. Sample data.
The deadlines

Four options for an ECC system, and what each one costs you.

SAP's dates are fixed, and the window for the cheapest options is already narrowing. Before choosing a route, it helps to see every option on the table, including the ones we wouldn't recommend.

202520262027202820292030203120322033Mainstream maintenanceExtended maintenance (+2 points)RISE transition optionTodayEnd 2030: on SAP HANA,under RISE, to qualify
Option 1

Stay, pay extended maintenance

Keep ECC on SAP support until the end of 2030.

  • Buys three years
  • Two-point premium on your maintenance fee
  • Only the last three enhancement packages qualify
  • Pushes the project into the busiest years for SAP skills
Option 2

Switch to third-party support

Leave SAP support for an independent provider.

  • Lower annual fee
  • No SAP legal, tax or security updates
  • Reinstatement fees if you return to SAP
  • The move still has to happen eventually
Option 3

RISE transition option

Run ECC in SAP's private cloud with support until 2033, as a bridge.

  • Three more years for very complex estates
  • Only with a RISE contract, on SAP HANA by end of 2030
  • Price uplift for commitments made after 2025
  • Essential fixes only, no new features
Option 4 · Our advice for most

Plan the move now

Choose a route and start the preparation work this year.

  • Your timing, not SAP's deadline
  • Preparation done while ECC is stable
  • Partner and SAP capacity still available
  • Benefits start years earlier

Dates and conditions as published by SAP and reported by SAPinsider. The transition option also requires a minimum system size and SAP's top support plan. Confirm current terms for your contract.

Already on S/4HANA?

Your release has a date too.

Moving from ECC to S/4HANA on-premise wasn't the end of the road. Each on-premise release has its own maintenance end. Releases before 2023 got five years of mainstream maintenance. From 2023, SAP ships a release every two years, each with seven years of maintenance.

If your release is close to its end, the choice is another on-premise upgrade project, or moving to SAP Cloud ERP Private, where SAP runs the upgrades.

ReleaseMainstream maintenance toStatus
1909 and earlierEndedAct now
2020End of 2025Ended
2021End of 2026Ending
2022End of 2027Plan now
2023End of 2030Supported
2025End of 2032Current

Based on SAP's published release and maintenance strategy. Check your exact release and feature pack in SAP's Product Availability Matrix.

Four routes

Where you are, where you're going, and what comes with you.

The starting system and the target decide which paths are open. SAP Cloud ERP (Public Edition) is always a fresh start. SAP Cloud ERP Private can take your existing system as it is.

ToSAP Cloud ERP PrivateToSAP Cloud ERP
SAP ECCECC 6.0, any enhancement pack
ECC → Cloud ERP Private

Convert, select or start fresh

All three paths are open: convert the whole system, carry over selected data and processes, or reimplement.

HistoryCustom codeConfiguration
Effort Largest change in software, smallest in process
ECC → Cloud ERP

Fresh start, with data

A new implementation on SAP's standard processes. Master data and open items move across, and some can be pulled directly from ECC.

Master dataOpen itemsCustom codeFull history
Effort Biggest process change, cleanest result
S/4HANA on-premiseAny release you run today
S/4HANA → Cloud ERP Private

Move and upgrade

You're already on S/4HANA, so the system moves to SAP's private cloud and is brought up to a current release.

Everything
Effort The shortest route
S/4HANA → Cloud ERP

Fresh start, with data

A new implementation on the public edition, with master data and open items migrated. Worth it if you want SAP's standard and twice-yearly innovation.

Master dataOpen itemsCustom code
Effort Process change, simpler system to run

Effort is relative and depends heavily on how customised your system is and how clean your data is.

Selective data transition

The middle path, in four techniques.

Between converting everything and starting from scratch, there's a set of specialist techniques for choosing exactly what moves. They suit groups that want to restructure during the move, for example merging company codes, carving out a business, or going live country by country.

Shell conversion

Your system's configuration and custom code are converted without the business data. Selected data is then loaded into the clean shell.

Use when: your configuration is good but you want to leave old data and history behind.

Mix and match

A new S/4HANA system is installed, and only the configuration and code you choose are carried across. Everything else is rebuilt on standard.

Use when: some areas work well and others need a redesign.

Client transfer

A complete client, with its configuration, master and transaction data, moves into the new system. Several source systems can be merged.

Use when: you're consolidating several SAP systems into one.

Company code transfer

One company code at a time moves across with its data, while the rest of the business stays on ECC until its turn.

Use when: you want phased go-lives by country or business unit.

Selective data transition uses specialist tools from SAP and certified partners. It needs more planning than a conversion, but gives you control that neither of the other routes can.

Start now

Six things you can do this quarter, whatever route you pick.

The work that makes migrations late is mostly preparation, and most of it can start before you've signed anything. Every item below makes the move shorter, cheaper and less risky.

Run SAP's Readiness Check

A free SAP analysis of your system: which SAP changes affect you, how much custom code you use, and how large your data really is.

Why now: it turns opinions into numbers for your business case.

Convert customers and suppliers

S/4HANA replaces separate customer and supplier records with a single business partner. The conversion can be done, and tested, in ECC today.

Why now: it's often the longest data task, and it doesn't need the new system.

Archive old data

Archive closed years of documents you no longer need online. A smaller database means a shorter conversion weekend and lower running costs.

Why now: archiving has its own lead time and approvals.

Retire unused custom code

Usage statistics show which programs nobody has run in a year. Deleting them now means nothing to adapt, test or migrate later.

Why now: every object removed is one less to fix.

Clean up finance

S/4HANA brings everything into one financial journal. Asset accounting, ledgers and reconciliation issues need to be resolved first.

Why now: finance checks are the most common conversion blocker.

Cleanse master data

Duplicate customers, blocked suppliers, unused materials and missing tax numbers. Fix them once at the source.

Why now: it pays off on every route, including a fresh start.

What changes inside

The changes you'll meet, and how much each one matters.

S/4HANA isn't ECC on a faster database. SAP simplified the data model and replaced several older functions. SAP's Readiness Check lists the ones relevant to your system. These are the ones almost every ECC customer meets.

AreaIn ECCIn S/4HANAImpact
Customers and suppliersSeparate customer and vendor recordsOne business partner for both, converted before the moveHigh
FinanceSeparate GL, CO, asset and material tables reconciled at month-endOne universal journal for all postings, with new asset accountingHigh
Inventory valuationMaterial ledger optionalMaterial ledger always on, with actual costing optionalMedium
Credit managementCredit checks in salesSAP Credit Management, with credit segments and rulesMedium
RebatesRebate agreements in salesSettlement management with condition contractsMedium
WarehouseClassic warehouse managementExtended Warehouse Management is the strategic optionMedium
Material numbersUp to 18 charactersUp to 40 characters, which matters for interfaces and custom codeLow
User interfaceSAP GUI transactionsRole-based Fiori apps, with SAP GUI still available in Private EditionMedium
OutputClassic output conditions and formsNew output management framework alongside the classic oneLow

Impact is typical, not universal. A business that uses classic warehouse management heavily, for example, will rate it high.

Inside a system conversion

Eight steps, rehearsed until they're routine.

For conversions to SAP Cloud ERP Private, the sequence is well established. What makes it safe is repetition. We run the whole sequence on copies of your production system until timings are known and every issue has a fix.

1

Assess

Readiness Check, simplification items, custom code analysis and sizing.

2

Prepare

Business partner conversion, finance checks, archiving and code clean-up in ECC.

3

Convert

Database and software converted to SAP S/4HANA in one technical run, using SAP's own conversion tools.

4

Migrate finance

Historical finance data rebuilt into the new single journal, then reconciled to the old totals.

5

Adapt code

Remaining custom code fixed for S/4HANA's data model, or replaced by standard.

6

Roles and Fiori

Users moved from old transactions to role-based Fiori apps, with roles rebuilt to match.

7

Test

Regression, integration and user acceptance tests on the converted system.

8

Cut over

The final run on production over a planned weekend, with a fallback plan ready.

Steps 3 to 7 are repeated in at least two or three mock conversions before production.

Downtime

Measured in rehearsals, not promised in a proposal.

The question every board asks is how long the business will be offline. The honest answer comes from mock conversions on a copy of your production data. Each rehearsal is faster than the last, as we archive more, tune the run and parallelise the steps.

The method matters too. SAP's conversion tooling offers several ways to move work out of the downtime window. We pick one based on your database size and how long the business can stop.

Business downtime by rehearsal

Example. The dashed line is a 42-hour weekend window.

Mock 151 h
Mock 237 h
Mock 329 h
Production28 h

Illustrative. Real figures depend on database size, hardware, archiving and the conversion method.

Standard conversion

Database migration and software conversion in one run during the downtime window.

Most systems
Downtime-optimised

Large tables and much of the finance conversion run while the business keeps working, leaving a smaller final step.

Large systems
Near-zero downtime

A specialist service that replicates changes continuously, so the switch-over takes hours.

24/7 operations
Custom code

Most of it shouldn't make the trip.

A typical ECC system carries thousands of custom objects built over fifteen years or more. SAP's own analysis tools show which ones are actually used, and which ones S/4HANA's changes will break. Usually, the majority can simply be retired.

Usage dataMonths of real usage statistics collected from production, so nothing is retired on a guess.
Custom code checksSAP's automated checks flag every object affected by the simplifications above.
Quick fixesMany findings are fixed automatically in SAP's development tools.
Clean core reviewCode that stays is rebuilt on released interfaces, or moved to SAP BTP, so it survives future upgrades.
Beyond the ERP

The systems around ECC have deadlines too.

ERP rarely moves alone. The systems around it are often on the same maintenance clock, and they're easy to forget until late in the plan. We map your whole SAP landscape in the assessment.

From SAP PI/PO

Integration Suite

Interfaces move from Process Integration to SAP Integration Suite. SAP provides migration tooling for many standard patterns.

Mainstream maintenance ends 2027
From SAP CRM, SRM, SCM

Into S/4HANA or the cloud

Many functions are now in S/4HANA itself. Others move to SAP's cloud products. These systems aren't covered by the ECC transition option.

Same 2027 and 2030 dates as ECC
From SAP BW

Analytics and data

Reporting moves to embedded S/4HANA analytics, SAP BW/4HANA or SAP's Business Data Cloud, depending on what you report on.

Plan alongside ERP
From GRC and roles

Access and security

Transaction-based roles are rebuilt around Fiori apps, and access controls are revalidated for the new roles.

Part of every conversion
From third-party interfaces

Partner systems

Banks, e-commerce, logistics and payroll interfaces are checked for data model changes, such as business partners and longer material numbers.

Test early
From non-HANA databases

SAP HANA

Systems on Oracle, SQL Server or DB2 move to SAP HANA as part of the conversion, which also affects database licensing.

Required for S/4HANA
After the move

A technical move is the start, not the finish.

A conversion keeps your processes the same, so the business benefits come from what you switch on afterwards. We plan these in from the start, so the move pays for itself.

Finance

One journal, faster close

All finance and controlling in one table: real-time margin reporting, no reconciliation between ledgers, and a shorter month-end.

People

Fiori for every role

Role-based apps and a personal home page replace transaction codes. Training focuses on what changes for each role.

Insight

Live analytics

Reports that run directly on live transactions, plus alerts for late deliveries, credit blocks and unbilled orders.

AI

Joule and AI agents

SAP's AI works on S/4HANA's data model, not on ECC. The move is what opens the door.

Operations

Less to run

SAP runs the infrastructure, database and technical operations, so your team can move from keeping the lights on to improving processes.

Clean core

Easier upgrades

With custom code cleaned up and new extensions built the upgrade-safe way, future releases become routine.

© 2026 Mawkish Technologies. This guide, its diagrams and illustrations are protected by copyright. You’re welcome to learn from it and to quote it with credit and a link. Reproducing it, by hand or through AI, and publishing it as your own is not allowed. Read our copyright notice

Questions we hear

Straight answers.

When exactly does SAP stop supporting ECC?

Mainstream maintenance ends at the end of 2027. Extended maintenance runs from 2028 to the end of 2030 at a two-point premium, and only for the last three enhancement packages. After that, the only SAP-supported option is the RISE transition option to 2033, which needs a RISE contract and an SAP HANA system moved into SAP's private cloud by the end of 2030.

Should we wait for the 2033 option?

Only if your landscape is genuinely too complex to move by 2030. It provides essential fixes but no new features, the price rises for later commitments, and the project still has to happen. For most mid-sized companies, it costs more than it saves.

We're already on S/4HANA on-premise. Do we need to move?

Check your release. Releases before 2023 had five years of mainstream maintenance, and several have ended or end soon. From 2023, each release gets seven years. Moving an existing S/4HANA system to SAP Cloud ERP Private is the shortest route on this page and stops the cycle of upgrade projects.

Our ECC runs on Oracle or SQL Server. Is that a problem?

No, but it adds a database migration to SAP HANA. SAP's conversion tools handle the database migration and the software conversion in one run. The database size after archiving is what drives the downtime.

What happens to our history if we choose a fresh start?

Open items, balances and master data move across. Older history usually stays in a read-only copy of the old system or an archive for audit and reference. Selective data transition can bring a defined number of years of history into the new system if you need it.

How long does a conversion take?

Typically 12 to 24 months from assessment to go-live, depending on system size, custom code, data quality and integrations. Preparation work done in advance shortens it.

Can we change processes during a conversion?

Keep it limited. The safest approach is to convert first, then improve processes in planned waves after go-live. If you need to restructure during the move, for example by merging company codes, selective data transition is the better route.

Start here

Know your route, your effort and your downtime.

Our migration assessment runs SAP's Readiness Check on your system, analyses your custom code and data, and gives you a recommended route with a timeline and budget range.

  • Recommended route, with reasons
  • Custom code findings and clean-up plan
  • Preparation work you can start now
  • Downtime estimate and approach
  • Timeline, team and budget range