Services / Cloud Infrastructure / Migrate & Modernise
Cloud Infrastructure · Migrate & Modernise

Modernise your infrastructure, from virtual machines to managed services.

We help you move beyond servers you have to patch and babysit, towards managed services, containers and serverless on AWS, Microsoft Azure and Google Cloud. The result is infrastructure that scales with demand, costs less effort to run, and lets you exit your data centre on a plan you control.

82%Of container users run Kubernetes in production
98%Of organisations surveyed use cloud native techniques
Jan 2027Windows Server 2016 extended support ends
Why it matters

Why modernise, not just move

Moving virtual machines to the cloud as they are is often the right first step, but it keeps the same patching, sizing and operating work you had before. Many workloads can run with far less effort on managed databases, container platforms or serverless functions, where the cloud provider runs the underlying servers. Operating system support dates, such as the end of Windows Server 2016 extended support in January 2027 and data centre contract renewals give a natural moment to decide which path each workload should take.

Less undifferentiated work

Managed services take over patching, backups and failover. Your team spends time on applications instead of servers.

Scale with demand

Containers and serverless scale up for month end or seasonal peaks and back down afterwards, instead of being sized for the worst day.

Data centre exit on your terms

Managed VMware services let you leave the data centre quickly, then modernise workloads at your own pace.

Faster, safer change

Automated builds and infrastructure as code make releases repeatable and environments consistent.

What we do

What we do

We assess your estate and move each workload to the most suitable modern platform.

01

Modernisation assessment

We review applications, servers and data centre contracts and score each workload for modernisation potential. You get a roadmap that balances speed, risk and effort.

02

Data centre exit

We plan and run the move out of your data centre, using managed VMware services where a quick exit matters. Workloads then modernise in the cloud.

03

Managed databases

We move self-managed databases on virtual machines to managed database services with built-in backup and high availability.

04

Containers and Kubernetes

We containerise suitable applications and run them on managed Kubernetes or serverless container platforms, with secure build pipelines.

05

Serverless and event driven

We replace scheduled jobs, file processing and integration scripts with serverless functions and managed messaging, so you pay for use, not idle servers.

06

Infrastructure as code

We define networks, platforms and services in code, so environments can be rebuilt, reviewed and audited.

How it works

How it works

  1. 1

    Assess

    We collect inventory and usage data, interview application owners and identify quick wins and harder cases.

    2 to 4 weeks
  2. 2

    Design the target platforms

    We design the landing zone, container platform, managed data services and pipelines your workloads will use.

    2 to 4 weeks
  3. 3

    Pilot

    We modernise one or two representative workloads end to end to prove the patterns and tooling.

    4 to 6 weeks
  4. 4

    Scale out

    We modernise the remaining workloads in waves, reusing proven patterns and automation.

    Ongoing, in waves
  5. 5

    Retire and optimise

    We decommission old servers and data centre space, then tune capacity and spend.

    2 to 4 weeks per wave
Across AWS, Azure and Google Cloud

Modern platforms on each cloud

The native services we use when moving workloads off traditional servers.

NeedAWSMicrosoft AzureGoogle Cloud
Managed KubernetesAmazon Elastic Kubernetes Service (EKS)Azure Kubernetes Service (AKS)Google Kubernetes Engine (GKE)
Serverless containersAmazon ECS with AWS FargateAzure Container AppsCloud Run
Serverless functionsAWS LambdaAzure FunctionsCloud Run functions
Managed VMware for data centre exitAmazon Elastic VMware ServiceAzure VMware SolutionGoogle Cloud VMware Engine
Moving VMs into containersAWS App2ContainerAzure MigrateMigrate to Containers
Managed relational databasesAmazon RDS and Amazon AuroraAzure SQL Database and Azure Database for PostgreSQLCloud SQL and AlloyDB for PostgreSQL
Infrastructure as codeAWS CloudFormationBicepInfrastructure Manager
For SAP landscapes

Modernising around SAP

SAP systems themselves run on SAP HANA certified virtual machines, or under RISE with SAP where SAP runs the infrastructure, so they are not candidates for containers or serverless. The infrastructure around SAP is. Interface servers, file transfer jobs, custom portals, reporting databases and scheduled scripts can move to managed and serverless services, and new extensions can be built on SAP BTP or native cloud services instead of inside the ERP core. This keeps the SAP core clean, which makes S/4HANA upgrades easier.

  • SAP application and HANA database servers stay on certified infrastructure or move under RISE with SAP.
  • Custom file processing and integration scripts can become serverless functions connected to SAP Integration Suite.
  • Side-by-side extensions on SAP BTP or cloud native services keep custom code out of the ERP core.
  • Containers suit web portals and APIs that sit in front of SAP, with managed identity and secrets.

© 2026 Mawkish Technologies. This guide, its diagrams and illustrations are protected by copyright. You’re welcome to learn from it and to quote it with credit and a link. Reproducing it, by hand or through AI, and publishing it as your own is not allowed. Read our copyright notice

What you get

Deliverables

  • Modernisation assessment and workload roadmap
  • Target platform designs for containers, serverless and managed data
  • Data centre exit plan and timeline
  • Modernised pilot workloads with reusable patterns
  • Infrastructure as code and deployment pipelines
  • Decommissioning and optimisation report
Questions

Frequently asked

Should we modernise during migration or after?

For large estates, it is usually safer to move first and modernise afterwards, because changing everything at once raises risk. Workloads with a clear business case, or that are already being rewritten, can be modernised during the move.

Do we need Kubernetes?

Not always. Kubernetes suits teams running many services that need fine control. Serverless container platforms such as Cloud Run, Azure Container Apps or Amazon ECS with AWS Fargate are simpler for many applications. We recommend the lightest option that meets your needs.

How do we exit our data centre quickly?

Managed VMware services on each cloud let you move VMware workloads without converting them, which shortens the exit. Once in the cloud, workloads can be modernised to native services over time.

What about Windows Server 2016?

Extended support for Windows Server 2016 ends on 12 January 2027. Modernisation is a good moment to upgrade the operating system, move to Linux, or move the workload to a managed service that removes the operating system from your responsibility.

Can SAP run on containers or serverless?

No. SAP application servers and SAP HANA run on certified infrastructure or under RISE with SAP. Modernisation applies to the interfaces, extensions and systems around SAP.

Our Rueby Standard is the name we give to how we handle Infrastructure Modernisation: one accountable partner, from the first meeting to long after go-live.

© 2026 Mawkish Technologies. This guide, its diagrams and illustrations are protected by copyright. You’re welcome to learn from it and to quote it with credit and a link. Reproducing it, by hand or through AI, and publishing it as your own is not allowed. Read our copyright notice